The Bitter Lake Fence Everyone in Broadview Is Reading Wrong

August 20, 2026

Walk the loop around Bitter Lake Playfield this month and you will hit new chain-link fencing near Linden Ave N and N 143rd St, equipment staged where there used to be open grass, and a sign or two referencing Seattle Public Utilities. The easy conclusion, the one most people walking their dog past it seem to land on, is that the long-promised park upgrade is finally underway. That conclusion is wrong, and the reason it is wrong tells you more about how this corner of Broadview actually works than the fence itself does.

What is going up right now is not a park. It is a water tank. And the park most residents are picturing when they see that fence is, by the city's own account, roughly three years further out than the construction happening in front of them.

What the fence is actually for

The reservoir sitting on that 13-acre site has held drinking water for the neighborhood for decades in an open-air, 21-million-gallon basin. Seattle Public Utilities is replacing it with a partially buried tank that holds the same volume but covers a smaller footprint, freeing up land for other uses later. The Daily Journal of Commerce priced the replacement at roughly $58 million when SPU went looking for a contractor, a number that puts the scale of the project in perspective: this is not a landscaping job, it is a piece of regional water infrastructure that happens to sit inside a neighborhood park.

SPU is not doing this alone. The reservoir work is being run alongside Seattle Parks and Recreation, the Office of Arts & Culture, and the Department of Neighborhoods under what the city calls a One Seattle framework, four departments coordinating so that the tank replacement, the eventual park expansion, and public art installation land as one coherent project rather than four uncoordinated ones. That coordination is real. It is also exactly why the timelines do not match, and why the fence going up now says nothing about when the amenities behind it will change.

Two agencies, two very different clocks

Here is the mechanism that actually matters if you live near Bitter Lake and want to know what happens next. SPU and SPR are running sequential projects, not simultaneous ones, and each has its own schedule:

  • SPU builds the reservoir first, because construction will reshape the land itself. The agency has been preparing to put the reservoir construction out to bid in 2026, which is the activity behind this summer's fencing.
  • SPR cannot design the park until it knows the reservoir's final footprint. The agency is anticipating hiring a design consultant in late 2026 or early 2027 to take the 2024 preferred schematic and turn it into construction-ready plans.
  • Only after the reservoir is finished does SPR expect to break ground on the open space itself, with construction of the park improvements projected to begin around 2029.

The payoff at the end of that sequence is real: more than six acres of new open space, recreation amenities, and permanent public art on land currently occupied by an open reservoir. But the sequence is the point. A fence going up in 2026 is not a signal that a park is opening in 2026, or even 2027. It is a signal that the multi-year process required before that park can exist has finally started.

If you want the granular version, Seattle Public Utilities keeps a project page with construction updates, and Seattle Parks and Recreation runs a companion page tracking the design side. Signing up for updates on both is the only way to actually stay ahead of what is happening on site, because the two schedules move independently of each other.

What doesn't pause for any of this

Not everything on that block is waiting for 2029. The Bitter Lake P-Patch, the community garden plots on the reservoir property, will stay open to gardeners throughout construction, according to the Broadview-Bitter Lake Community Council's own resource page. If you have a plot there, or are on the waitlist for one, this project does not touch your growing season.

Separately, and this is a distinction worth holding onto, a pedestrian bridge replacement and playground improvement project at Bitter Lake Playfield has been targeted for completion in 2026. That is not the SPU reservoir work and not the SPR six-acre expansion. It is its own smaller project, on its own smaller clock, moving through the same general area at the same general time, which is part of why it is easy to mentally merge everything happening at Bitter Lake into a single story. It is not one story. It is at least three.

The other clock on the same three blocks

A half mile from the reservoir fence, Dunn Gardens runs on a schedule that has nothing to do with SPU or SPR and everything to do with the calendar itself. This Olmsted Brothers-designed estate garden, dating to 1915 and listed on the National Register of Historic Places, is not open for guided tours in August. Its tour season runs April through July, pauses, and picks back up in September through October.

If you have tried to book a visit to the seven-acre garden this month and hit a wall, that is not a booking error. It is the garden's actual, longstanding pattern, and it means the reopening in early September is the moment to plan around, not a random Tuesday sometime this fall. For a garden that measures its calendar in growing seasons rather than construction phases, August is simply the month it steps back.

That contrast is worth sitting with for a second. One institution on this stretch of Broadview is mid-decade in a multi-year infrastructure sequence. Another closes and reopens on a rhythm set a century ago and never touched since. Reading either one by the other's clock is how residents end up frustrated, whether that means expecting a park that is still years out or showing up to a garden that quietly takes the month off.

And the clock that never skips a week

Then there is the rhythm that does not care what year it is on either of those timelines. Friday Family Roller Skate Night at the Bitter Lake Community Center Annex, held at the back of Broadview-Thomson K-8 at 13052 Greenwood Ave N, runs weekly, 6:30 to 8:15 p.m., six dollars a head, ages five and up. It is the one piece of this neighborhood's texture that moves on a clock simple enough to set your watch by: every Friday, rain or shine, reservoir fence or no reservoir fence.

That is not a small detail. In a neighborhood where a major piece of infrastructure is visibly under construction and a beloved garden disappears for a month every summer, a dependable weekly gathering is doing real work. It is the thing that keeps showing up while everything else is mid-transition.

What this actually means if you live here

None of this changes what Bitter Lake will eventually become. The reservoir tank, once finished, frees up land for a genuinely larger public space than the neighborhood has now, with art and amenities the current fenced-off basin never offered. But if you are budgeting your expectations around a 2026 or 2027 park opening, the city's own project pages suggest otherwise. The realistic marker to watch for is SPR's design consultant hire, expected late 2026 or early 2027, because that is the step that will finally put a shape and a firmer date on the park portion of this project.

In the meantime, the P-Patch keeps growing, the pedestrian bridge and playground work moves on its own separate track toward a 2026 finish, Dunn Gardens reopens for tours in September, and Friday nights at the Annex keep running exactly as they have. Three institutions, three clocks, one fenced-off water tank in the middle that is doing exactly one job and nothing more.

If you are watching this corner of Broadview because you are thinking about what a home near it might be worth once that six-acre park actually opens, that is a longer and more specific conversation than a single blog post can cover. Brooke Davis has spent two decades reading how public projects like this one shape value in Seattle-area neighborhoods, long before the ribbon-cutting. Let's Connect when you are ready to talk through what it means for your street.

Work With Brooke

Her passion is helping clients achieve their homeownership goals, from a home seller looking to upgrade or relocate to a first-time buyer and a seasoned investor looking to build their financial portfolio. Brooke will guide and advocate for you through the entire process from beginning to end. Contact her today!